Case study

06

Ceramics

·

2025

All work ↗

Kiln & Co

A ceramics studio that fires everything twice and ships everything once. We designed packaging that survives the post, and a shop that tells you which kiln your bowl came out of.

Client

Kiln & Co, Antwerp

Scope

Packaging, Shop

Timeline

6 weeks, autumn 2025

Glazes waiting for the second firing

01

The brief

It started with a pull

Brief No. 0043771 Sep 2025

Packaging for a ceramics studio, live in 6 weeks.

Rough budget€15k to €30k
First callWithin one day
Pulled by Lotte, Kiln & Co★
Accepted

The challenge

One in nine bowls arrived broken. The rest arrived in bubble wrap that felt nothing like the studio, which smells of clay and woodsmoke and has a dog called Biscuit. Lotte wanted the unboxing to feel like a visit.

What we made

A moulded paper cradle that holds every bowl by its foot, a box printed in one warm orange, and a card in each one with the kiln, the firing date and the name of whoever glazed it. The shop shows the same, so you can pick your firing.

1 in 140

Bowls broken in the post, from 1 in 9

2.1×

Repeat orders in six months

100%

Paper packaging, no plastic

11 days

Wait list for each new firing

100%

Paper packaging, no plastic

11 days

Wait list for each new firing

02

The work

Packaging, Shop

Kiln & Co
Kiln & Co

Fired twice. Shipped once.

Fired twice. Shipped once.

Fired twice. Shipped once.

Lotte at the wheel, Antwerp

Kiln

#FF8A5B

Clay

#2A120A

Slip

#F6EBDD

Aa

Geist, 600

Plain and sturdy, so the bowls do the talking

03

Six weeks

Every box dropped from a table

Week 1

A week in the studio

Five days at the wheel, the kiln and the packing table, mostly getting in the way.

Weeks 2 and 3

The cradle

Fourteen paper cradles, each one dropped from a table with a bowl inside. Number nine won.

Weeks 4 and 5

Box and shop

One orange, one card per bowl and a shop that lets you pick your firing.

Week 6

First firing

Two hundred boxes out in a weekend, and a wait list by Monday.

“

“

“

People send us photos of the box now. Before, they only sent us photos of the pieces.

LJ

Lotte Janssens

Founder, Kiln & Co

04

Credits

Three people, six weeks

Creative direction

Mateo Alves

Packaging

Imani Brooks

Shop

Jonas Weber

Next case study

07

/

Logistics

·

2024

PARCEL

→

→

→

Amsterdam

Westerstraat 187

1015 MA Amsterdam

+31 20 555 0187

New York

88 Kent Avenue

Brooklyn, NY 11249

+1 718 555 0188

© 2026 Leverage Studio B.V.

AMS

00:00

· NYC

00:00

Amsterdam

Westerstraat 187

1015 MA Amsterdam

+31 20 555 0187

New York

88 Kent Avenue

Brooklyn, NY 11249

+1 718 555 0188

© 2026 Leverage Studio B.V.

AMS

00:00

· NYC

00:00

Amsterdam

Westerstraat 187

1015 MA Amsterdam

+31 20 555 0187

New York

88 Kent Avenue

Brooklyn, NY 11249

+1 718 555 0188

© 2026 Leverage Studio B.V.

AMS

00:00

· NYC

00:00

PRO

Buy me

↗

Case study

06

Ceramics

·

2025

All work ↗

Kiln & Co

A ceramics studio that fires everything twice and ships everything once. We designed packaging that survives the post, and a shop that tells you which kiln your bowl came out of.

Client

Kiln & Co, Antwerp

Scope

Packaging, Shop

Timeline

6 weeks, autumn 2025

Glazes waiting for the second firing

01

The brief

It started with a pull

Brief No. 0043771 Sep 2025

Packaging for a ceramics studio, live in 6 weeks.

Rough budget€15k to €30k
First callWithin one day
Pulled by Lotte, Kiln & Co★
Accepted

The challenge

One in nine bowls arrived broken. The rest arrived in bubble wrap that felt nothing like the studio, which smells of clay and woodsmoke and has a dog called Biscuit. Lotte wanted the unboxing to feel like a visit.

What we made

A moulded paper cradle that holds every bowl by its foot, a box printed in one warm orange, and a card in each one with the kiln, the firing date and the name of whoever glazed it. The shop shows the same, so you can pick your firing.

1 in 140

Bowls broken in the post, from 1 in 9

2.1×

Repeat orders in six months

100%

Paper packaging, no plastic

11 days

Wait list for each new firing

02

The work

Packaging, Shop

Kiln & Co

Fired twice. Shipped once.

Lotte at the wheel, Antwerp

Kiln

#FF8A5B

Clay

#2A120A

Slip

#F6EBDD

Aa

Geist, 600

Plain and sturdy, so the bowls do the talking

03

Six weeks

Every box dropped from a table

Week 1

A week in the studio

Five days at the wheel, the kiln and the packing table, mostly getting in the way.

Weeks 2 and 3

The cradle

Fourteen paper cradles, each one dropped from a table with a bowl inside. Number nine won.

Weeks 4 and 5

Box and shop

One orange, one card per bowl and a shop that lets you pick your firing.

Week 6

First firing

Two hundred boxes out in a weekend, and a wait list by Monday.

“

People send us photos of the box now. Before, they only sent us photos of the pieces.

LJ

Lotte Janssens

Founder, Kiln & Co

04

Credits

Three people, six weeks

Creative direction

Mateo Alves

Packaging

Imani Brooks

Shop

Jonas Weber

Next case study

07

/

Logistics

·

2024

PARCEL

→

Amsterdam

Westerstraat 187

1015 MA Amsterdam

+31 20 555 0187

New York

88 Kent Avenue

Brooklyn, NY 11249

+1 718 555 0188

© 2026 Leverage Studio B.V.

AMS

00:00

· NYC

00:00

PRO

Buy me

↗

Create a free website with Framer, the website builder loved by startups, designers and agencies.