Case study

07

Logistics

·

2024

All work ↗

PARCEL

A delivery company with 40 product teams and 40 shades of blue. We built one design system they all share, and a courier dashboard designed in the van, not in the office.

Client

Parcel Group, Rotterdam

Scope

Product, Design system

Timeline

12 weeks, Q1 2024

Monday morning at the Rotterdam depot

01

The brief

It started with a pull

Brief No. 00284120 Nov 2023

A design system for a delivery company, live in Q1.

Rough budget€30k to €55k
First callWithin one day
Pulled by Ravi, Parcel★
Accepted

The challenge

Forty teams, three button libraries and a courier app that took nine taps to mark a parcel delivered, usually in the rain. Every new feature looked slightly different from the last one, and couriers had stopped reading the screen.

What we made

One design system with 120 components, written down so a new designer can ship on day two. Then we used it to rebuild the courier dashboard from the passenger seat of a van: big targets, one hand, and delivered in two taps.

2 taps

To mark a parcel delivered, from 9

40

Teams on one system

120

Components, all documented

22%

Less time per stop

120

Components, all documented

22%

Less time per stop

02

The work

Product, Design system

PARCEL
PARCEL

Two taps. Next stop.

Two taps. Next stop.

Two taps. Next stop.

A working session, week 4

Route

#7C93FF

Depot

#0B1440

Label

#F2F4FF

Aa

Bricolage Grotesque, 800, tracked wide

Loud on the van, calm in the app

03

Twelve weeks

Built in the van

Weeks 1 and 2

Ride along

Three days in delivery vans, counting taps. The record was eleven for one parcel.

Weeks 3 to 6

The system

120 components, one source of truth, and documentation a new designer can read in a morning.

Weeks 7 to 10

The dashboard

The courier app rebuilt on the system, tested from the passenger seat in the rain.

Weeks 11 and 12

Hand over

Forty teams trained, office hours every Thursday, and the old libraries switched off.

“

“

“

Our couriers stopped calling the app the enemy. That might be the best review we have ever had.

RM

Ravi Menon

VP Product, Parcel

04

Credits

Four people, twelve weeks

Product design

Lin Zhao

Design system

Imani Brooks

Engineering

Jonas Weber

Strategy

Sofie Laan

Next case study

08

/

Climate

·

2024

Brightwater

→

→

→

Amsterdam

Westerstraat 187

1015 MA Amsterdam

+31 20 555 0187

New York

88 Kent Avenue

Brooklyn, NY 11249

+1 718 555 0188

© 2026 Leverage Studio B.V.

AMS

00:00

· NYC

00:00

Amsterdam

Westerstraat 187

1015 MA Amsterdam

+31 20 555 0187

New York

88 Kent Avenue

Brooklyn, NY 11249

+1 718 555 0188

© 2026 Leverage Studio B.V.

AMS

00:00

· NYC

00:00

Amsterdam

Westerstraat 187

1015 MA Amsterdam

+31 20 555 0187

New York

88 Kent Avenue

Brooklyn, NY 11249

+1 718 555 0188

© 2026 Leverage Studio B.V.

AMS

00:00

· NYC

00:00

PRO

Buy me

↗

Case study

07

Logistics

·

2024

All work ↗

PARCEL

A delivery company with 40 product teams and 40 shades of blue. We built one design system they all share, and a courier dashboard designed in the van, not in the office.

Client

Parcel Group, Rotterdam

Scope

Product, Design system

Timeline

12 weeks, Q1 2024

Monday morning at the Rotterdam depot

01

The brief

It started with a pull

Brief No. 00284120 Nov 2023

A design system for a delivery company, live in Q1.

Rough budget€30k to €55k
First callWithin one day
Pulled by Ravi, Parcel★
Accepted

The challenge

Forty teams, three button libraries and a courier app that took nine taps to mark a parcel delivered, usually in the rain. Every new feature looked slightly different from the last one, and couriers had stopped reading the screen.

What we made

One design system with 120 components, written down so a new designer can ship on day two. Then we used it to rebuild the courier dashboard from the passenger seat of a van: big targets, one hand, and delivered in two taps.

2 taps

To mark a parcel delivered, from 9

40

Teams on one system

120

Components, all documented

22%

Less time per stop

02

The work

Product, Design system

PARCEL

Two taps. Next stop.

A working session, week 4

Route

#7C93FF

Depot

#0B1440

Label

#F2F4FF

Aa

Bricolage Grotesque, 800, tracked wide

Loud on the van, calm in the app

03

Twelve weeks

Built in the van

Weeks 1 and 2

Ride along

Three days in delivery vans, counting taps. The record was eleven for one parcel.

Weeks 3 to 6

The system

120 components, one source of truth, and documentation a new designer can read in a morning.

Weeks 7 to 10

The dashboard

The courier app rebuilt on the system, tested from the passenger seat in the rain.

Weeks 11 and 12

Hand over

Forty teams trained, office hours every Thursday, and the old libraries switched off.

“

Our couriers stopped calling the app the enemy. That might be the best review we have ever had.

RM

Ravi Menon

VP Product, Parcel

04

Credits

Four people, twelve weeks

Product design

Lin Zhao

Design system

Imani Brooks

Engineering

Jonas Weber

Strategy

Sofie Laan

Next case study

08

/

Climate

·

2024

Brightwater

→

Amsterdam

Westerstraat 187

1015 MA Amsterdam

+31 20 555 0187

New York

88 Kent Avenue

Brooklyn, NY 11249

+1 718 555 0188

© 2026 Leverage Studio B.V.

AMS

00:00

· NYC

00:00

PRO

Buy me

↗

Create a free website with Framer, the website builder loved by startups, designers and agencies.